Scaffolding shoring

Short Description:

Scaffolding Steel prop shoring are combined with heavy duty prop, H beam, Tripod and some other formwork accessories.

This scaffolding system mainly support formwork system and bear high loading capacity. In order to keep the whole system stable, the horizontal direction will be connected by steel pipe with coupler. They have the same function as scaffolding steel prop.

 


  • Surface Treatment: Powder coated/Hot Dip Galv.
  • Raw Materials: Q235/Q355
  • MOQ: 500pcs
  • Product Detail

    Product Tags

    Scaffolding Steel prop shoring can give more loading capacity because of heavy duty prop, especially for concrete projects.

    The heavy duty prop mainly use Q235 or Q355 high tensile strength  pipe to machining and treat them by powder coated or hot dip galv. to anti rust. All accessories are made by high quality.

    Scaffolding Steel Prop

    Steel props is a kind of adjustable vertical pipe support for concrete formwork supporting. One set of steel prop consist of inner tube, outer tube, sleeve, upper and base plate, nut, lock pin etc. Steel prop is also called scaffolding prop, shoring jack, shoring prop, formwork prop, construction prop. Steel prop is adjustable by closed heights and open heights, so people also call it as telescopic prop. The closed heights and open heights can make prop to support the heights we required that also very flexible when used in construction.

    Props shoring tripod are made by square pipe, most height use 650mm, 750mm, 800mm etc base on different customers' requirements.

    Formwork accessories, scaffolding prop fork head also can be customized according to requirements details.

     

    Basic information

    1.Brand: Huayou

    2.Materials: Q235, Q355 pipe

    3.Surface treatment: hot dipped galvanized , electro-galvanized, painted, powder coated.

    4.Production procedure: material---cut by size---punching hole---welding ---surface treatment

    5.Package: by bundle with steel strip or by pallet

    6.Delivery time: 20-30days depends on the quantity

    Size as following

    Item

    Min.-Max.

    Inner Tube(mm)

    Outer Tube(mm)

    Thickness(mm)

    Heany Duty Prop

    1.8-3.2m

    48/60

    60/76

    1.8-4.75

    2.0-3.6m

    48/60

    60/76

    1.8-4.75

    2.2-3.9m

    48/60

    60/76

    1.8-4.75

    2.5-4.5m

    48/60

    60/76

    1.8-4.75

    3.0-5.5m

    48/60

    60/76

    1.8-4.75

    2 8 10 11


  • Previous:
  • Next:

  • Products categories